Parker Transair 2019

83 1 2 3 4 5 1 2 3 4 5 SYSTEM MODIFICATION REPLACING A PIPE-TO-PIPE CONNECTOR WITH A TEE REPLACING A PIPE-TO-PIPE CONNECTOR WITH A BALL VALVE 1 - Loosen the 2 nuts. 2 - Slide them along the pipe on either side of the connector. 3 - Remove the body of the connector, together with the nuts. Re-tighten the nuts on the body of the connector for a further use. 1 - Loosen the 2 nuts. 2 - Slide them along the pipe on either side of the connector. 3 - Remove the body of the connector, toge- ther with the nuts. Re-tighten the nuts on the body of the connector for a further use. 4 - Slide the nuts of the tee and position the body of the tee between the 2 pipes such that the solid and empty arrows are facing each other. 5 - Re-tighten the nuts until the empty and solid arrows are aligned with each other. 4 - Slide the nuts of the valve and position the body of the valve between the 2 pipes so that the empty and solid arrows are facing each other 5 - Re-tighten the nuts until the empty and solid arrows are aligned with each other. FOR DIAMETERS Ø16.5 - Ø25 - Ø40 ONLY FOR DIAMETERS Ø16.5 - Ø25 - Ø40 ONLY Installation Guide

RkJQdWJsaXNoZXIy MzYzNzg=