Parker Transair 2019

69 Best Practices I I When installing a Transair ® system, the work should be performed in accordance with good engineering practices. I I Maintain a consistent level of good quality air by use of adequate filtration at the compressor outlet. I I Never encase the network in order to facilitate maintenance or servicing. I I Bends and bypasses represent sources of pressure drop. I I To avoid excessive pressure loss, use modular consoles to offset the network and to bypass obstacles. I I Keep in-line pipe diameter reductions to a minimum. I I The diameter of the pipe will influence pressure drop and the operation of point-of-use equipment. I I Select the diameter according to the required flow rate and acceptable pressure drop at the points of use. I I Position drops as close as possible to the point of use. Installation Guide